VASA FITNESS

COMPLETED PROJECTS

VASA FITNESS – Matteson, IL

status: Complete

GCs don’t want babysitting. Brands don’t want compromise.  They want a team that shows up ready to execute the plan to the letter and that’s exactly what we delivered at Vasa Fitness Matteson.

Construction Ahead, USA has completed the exterior metal cladding scope for this 86,000+ sq ft rebrand — transforming a long-vacant retail building into a flagship fitness hub.


The focal brand tower, clad in MBCI FW120 panels (20 ga., without bead) in Bright Red and Midnight Bronze, stands as designed. No VE shortcuts. No scope erosion. A premium system installed to spec, reinforcing VASA’s identity from the street to the skyline.

For the General Contractor: tight shop drawing coordination, early material buyouts, and crews that executed without delay kept the schedule locked in.

For the Client Vasa brand integrity was protected. The tower looks bold, recognizable, and built to last.


Credit to Brennan Goodman, Project Manager, and Jim Richmond, Superintendent at Pro Commercial, for disciplined project leadership and running a sharp jobsite.

Materials supplied by MBCI, a Cornerstone Building Brands company, whose nationwide strength ensured supply reliability throughout the project.


Synergy With Atlas Building Group

Atlas Building Group emphasizes integrity, collaboration, quality, and skilled people. On this project, those principles were clear in action: open communication, disciplined project management, and a shared commitment to workmanship. Together, we delivered a storefront that reflects Burlington’s brand standard and will serve for years to come.


This isn’t just a finished gym. It’s a new community anchor — and proof that when we say Building Strength Inside and Out, we mean it.


Project Details


architect


General contractor


materials


IMPROVE ★ STRENGTHEN ★ PROTECT