york county regional training center, alfred me
Where mission-critical meets envelope excellence.
Construction Ahead, USA has been selected to provide a high-performance exterior system for the New York County Regional Training Center, a multi-million dollar investment in Maineโs first responder infrastructure.
Designed for durability, this facility will serve law enforcement, fire, EMS, and dispatch personnel throughout the region. Itโs a facility built for those who respond when it matters most, so itโs only fitting that its construction meets the same standard.
Our scope includes:
Thermal Envelope
Thermasheathยฎ polyiso insulation provides an R-value of 6.0 - 6.5 per inch, meeting IECC and ASHRAE 90.1 requirements for continuous insulation in commercial wall assemblies.Rainscreen System
HCI-Girtโข & CI-Girt 075/150โข & PanelRail 200โข integrates a ThermaStopโข washer, reducing thermal bridging and enhancing drainage per ASTM E2273.Durability & Compliance
The wall assembly is engineered for NFPA 285 compliance, ensuring flame propagation resistance, and is designed to withstand wind loads and thermal cycling in accordance with IBC and ASHRAE 90.1 standards.
Nichiha USA | PAC-CLAD | Petersen | KNIGHT WALL SYSTEMSยฎ | Rmax, A Sika Brand